The Continuum on South Beach

Overview

_________

Location: Miami, FL 

Owner: The Continuum on South Beach Master Association, Inc.

Engineer: Willcott Engineering, Inc.

Project Duration: 2 Years

The Continuum front entrance and plaza deck sits on an elevated slab above the parking garage. The parking garage was experiencing water intrusion through multiple locations due to the failed waterproofing system located at the structural slab. The repair protocol called for complete demolition of the existing overburden down to the structural slab, removal of existing waterproofing, installation of new waterproofing system, and then complete build back of plaza deck. The main reason for this project was to stop any leaks that occurred in the parking garage and to protect the structure for many years to come.