_________
Location: Miami, FL
Owner: The Continuum on South Beach Master Association, Inc.
Engineer: Willcott Engineering, Inc.
Project Duration: 2 Years
The Continuum front entrance and plaza deck sits on an elevated slab above the parking garage. The parking garage was experiencing water intrusion through multiple locations due to the failed waterproofing system located at the structural slab. The repair protocol called for complete demolition of the existing overburden down to the structural slab, removal of existing waterproofing, installation of new waterproofing system, and then complete build back of plaza deck. The main reason for this project was to stop any leaks that occurred in the parking garage and to protect the structure for many years to come.
CPR Mid-Atlantic:
2811 Lord Baltimore Drive Baltimore, MD 21244
Telephone: 410-298-2669
Toll Free: 800-452-3137
Fax: 410-298-4086
E-mail: CPRMidAtlantic@concretecpr.com
CPR Southeast:
601 NE 44th Street Oakland Park, FL 33334
Telephone: 954-505-3977
Toll Free: 800-452-3137
Fax: 954-272-7540
E-mail: CPRSouthEast@concretecpr.com
From our actively involved founders to our team of collaborative and friendly employees we all feel at home in the CPR family.