Hampton Plaza

Hampton Plaza

Overview

Location: Towson, MD

Owner: Hampton Plaza LLP

Engineer: Morabito Consultants, Inc.

Project Value: $3,749,347.00

Project Duration: 2.75 years 

Located in downtown Towson, Maryland, Hampton Plaza was built in 1971.  There are 6 circular levels of parking below the 2 semi-circular office and apartment buildings.  From top down – Plaza, A, B, C, D and E with the Plaza and A level having parking and office/retail space with 36,000 square feet of parking area.  Levels B through E are 100% parking and are each roughly 77,000 square feet.   The total area is 380,000 square feet of garage space.  Over the past 40+ years, there have been several rounds of structural concrete repairs, waterproof coating installation in different areas of the garage and exterior ramps, however, after years of deferred maintenance, the post-tension structure was in need of substantial structural repairs.  The ownership began working with a structural consulting engineer in late 2015 to develop a plan to make global repairs to the garage levels.  They performed a full survey of each level which included chloride testing of the structural concrete at several locations throughout the garage and plaza levels to help determine which waterproofing and CIT materials would be prescribed to protect and prevent further corrosion and deterioration of structural concrete elements.  Bids were submitted in September of 2016 and the contract was awarded to the successful contractor in the spring of 2017.  Work began on-site in July of 2017. 


Being that this property had both office space and residential apartment tenants, the noise restrictions were more critical than most other properties.  Per the contract, concrete demolition and other noise generating work was limited to Monday through Friday from 5:00 PM to 9:00 PM (4 hours per day) and Saturday/Sunday from 10:00 AM to 9:00 PM.  In the early phases of the project, the crew was shut down several times even for using hammers or while setting up shoring.  There were numerous discussions with the ownership about what was included in “noise generating work”.  Therefore, work began with an adjusted weekly schedule including 2nd shift and also weekend shifts to take advantage of weekend demolition hours, and to avoid constant noise complaints and limit work shutdowns.  Phasing was limited to 100 spaces per phase, which was difficult because this also included spaces for shoring 2 levels below.  Drive lanes had to be kept open to allow parkers access to spaces not captured in the current phase of work.  These limitations resulted in 50+ phases over the 6 levels of the garage.  Additionally, there are 2 ramps on the exterior of the garage.  The upper ramp connects the Plaza level, A and B levels and the lower ramp connects D level to the C and B levels.  This meant that if the upper ramp was closed for repairs, all traffic needed to use the lower ramp, and it also meant that level A was inaccessible during the shutdown.  Repair work on the ramps, and any shutdowns of entire parking levels needed to be scheduled for weekends and planned well in advance with the property manager so notice could be given to all office and apartment tenants. 


Because the entire Plaza level was previously coated, the plan was to start on the Plaza level and work down with the assumption that the Plaza level would have the least amount of concrete and post-tension repairs.  However, it was discovered quickly that was not necessarily the case.  The initial chain drag survey revealed more concrete repairs than anticipated compared to what was laid out during the 2015 inspections.  There were some large slab repairs around columns where the post-tension strands crossed in all directions.  Due to the circular construction of this building, the post-tension cable layout was described by the engineer as a “wagon wheel” with “spokes” starting and stopping at the construction joint separating the inner and outer circles.  This layout made it difficult to track where the cables were broken within the slab, and also made it more difficult to repair the closer to the center of the wheel it was.  Additionally, the garage was built in the 70s when there were less strict quality control standards for post-tension cable installation, and we found several pockets with bare, uncut tendon tails rolled up and left in the slab to rust.  The amount of corrosion often made it difficult to remove sections of broken cables as well as feed the new post-tension tendon into the slab.  The base contract included 225 post-tension tendon repairs and 500 linear feet of new tendon.  At the end of the project, there was 947 cable repairs using thousands of pieces of dog bones, splice chucks and new end anchor hardware, and installed over 15,000 linear feet of new cable. 


After all concrete repairs and structural repairs were completed on each level, the next step was to apply the CIT/sealer treatment to all bare concrete surfaces.  Due to the high level of chlorides in the original concrete slabs, the consulting engineer had specified a double application of CIT followed by an application of a silane sealer to reduce infiltration of water into the slab and protect the reinforcement steel and post-tension strands from further corrosion.  Shotblasting was preformed to prepare the concrete surfaces to SP-3 profile.  This work was scheduled for the weekends because an entire level of the garage could be captured at once due to the offices needing less parking on Saturdays and Sundays.  Re-top coating of all previously installed waterproof vehicular coatings was also scheduled over a consecutive weekend.  In total, 180,000 square feet of CIT and silane sealer across all ramps and elevated slabs was applied, 126,000 square feet of vehicular urethane membrane was re-top coated and full system vehicular coating was also installed on key areas such as above mechanical rooms and electrical closets. 


Operational and schedule challenges, along with increased structural/post-tension repair quantities resulted in an extended schedule and nearly double contract value.  However, the team of contractor, owner and consultant were able to work together to overcome challenges and value design repairs to cut costs where possible, yet still providing quality work that addressed any structural deficiencies and extended the service life of the garage at Hampton Plaza.  Additionally, through communication, coordination and planning, all 50+ phases of work were completely with no major safety incidents. 

Landmark at Hillsboro

Landmark at Hillsboro

Overview

_________

Location: Hillsboro Beach, FL

Engineer: Bunker Engineering & Construction Services, Inc.

Owner: Landmark at Hillsboro Condominium Association, Inc.

Problem:

Landmark at Hillsboro Condominium was first built in the mid-1980s with an elevated pool deck above a parking garage. The parking garage had major water leaks due to the wear and tear of the existing waterproofing throughout the years. In June 2018, CP&R was contracted to strategically re-waterproof a portion of the pool deck to repair all the leaks. In the process, all necessary concrete structural repairs were made. The pool deck was also fully renovated with new pool finishes, a new fountain, a new handicap ramp, pavers and a new BBQ area.


Solution: 

  • Remove all existing pavers, topping slab, and old waterproofing
  • Repair all damaged existing concrete
  • Re-waterproof pool deck with Carlisle Membrane System
  • Remove and replace fountain
  • Build new BBQ area
  • Remove and replace pool finishes
  • Build new handicap ramp

Singer Island Hilton

Singer Island Hilton

Overview

_________

Location: Singer Island, FL

Owner: Host Hotels & Resorts, Inc.

Engineer: Tadjer-Cohen-Edelson Associates, Inc.

 

Problem: 

This eight story hotel building is approximately twenty three years old. The building frame consists of post-tension concrete slabs supported by reinforced concrete columns. The main building has rectangular and curved shaped balconies on all four elevations. The balcony slabs are approximately 5 1/2” thick and have embedded aluminum handrail posts near the edges. The top portion of the balcony slabs and balcony slab edges have a urethane coating with aggregate. There was damaged balcony slabs on all elevations, east, north, south, and west elevation tiers.

 

Solution: 

  • Full depth and partial depth surface concrete repairs
  • Reinforcing steel repair and slab edge repair
  • Post-tension cables and anchors repairs as well as replacement of severely corroded tendons with new 1/2” diameter tendons.
  • Post-tension anchors coating and replacement with new epoxy coated anchors
  • Handrail post repairs and coating of balcony slab surfaces

 

 

 

 

 

 

Aberdeen Arms

Aberdeen Arms

Overview

_________

Location: Highland Beach, FL 

Project Size: $1,245,000.00

Owner: Aberdeen Arms Association, Inc.

Engineer: Karin’s Engineering Group, Inc.

 

Aberdeen Arms is a mid-rise condominium building built in 1971, located in-between the Intracoastal Waterway and the Atlantic Ocean on the West side of A1A in Highland Beach, Florida. The structure is comprised of conventionally reinforced concrete slabs supported by beams, columns, and concrete masonry walls. The tower rises 10 floors and has approximately 117 units. A ramp along the property’s southern boundary leads to the elevated deck which supports both pedestrian and vehicular use.  Concrete masonry walls separate the owner patios from the parking deck. On the north side, there are fenced-in patios outside the individual units and a walkable courtyard leading to stairs and dock access. 

 

Global expansion joint failures and various waterproofing breaches that required remediation were observed on the building at the elevated decks and courtyard above the garage.  Active water intrusion was occurring at the expansion joints of the structure, jeopardizing the integrity of the concrete and causing water to intrude into the parking garage below.  Concrete spalls and rusted rebar were observed on the soffit, beams and columns of the structure.

 

The scope of work included removing the existing sand set pavers, failed waterproofing, drain replacement, new drain installations, concrete repair, new expansion joints, hot-applied waterproofing and sand set pavers.  Upon removal of the sand set pavers on the north side, the fence dividing the individual units was found to be deteriorated and in poor condition.  As a result, it was chosen to be removed and replaced with new kynar coated aluminum rails.  New planter walls were built along the south patios, providing the residents with increased privacy.   The failed cementitious coating at the entrance ramp was removed and replaced with a urethane coating and moisture barrier. 

 

Lauderdale One

Lauderdale One

Overview

Parking Garage Restoration

_________

Location: Fort Lauderdale, FL

Engineer: Karins Engineering Group

Owner: Lauderdale One Condominium Association

Lauderdale One Condominium is a 175-unit Condominium Association located in Ft. Lauderdale, Florida. The property consists of two luxury buildings and a 4-level parking garage. The parking garage had major water leaks onto the lower levels below. Concrete Protection & Restoration was contracted to waterproof the top floor of the parking structure to resolve these issues.

 

 

 

Scope of Work:

  • Remove all of the existing wheel stops and the cementitious slope along the perimeter of the deck.
  • Perform partial depth concrete repairs at the elevated slab. 
  • Install a new cementitious slope along the perimeter of the walls to allow for positive drainage.
  • Prepare the concrete surface per project requirements and install a traffic bearing membrane Line stripe parking spaces and install new wheel stops.

Sutton Terrace

Sutton Terrace

Overview

_________

Location: Bala Cynwyd, PA

Owner: Sutton Terrace Condominium Association

Engineer: O&S Associates

Project Duration: 6 months

Sutton Terrace is a hi-rise Condominium tower in Bala Cynwyd, PA just on the other side of US rt.1 from the City of Philadelphia. There are 12 balcony drops around the building. CP&R has been working on these balcony renovations since 2017 and has just completed the final 5 drops this year at the poolside elevation. The scope of our work includes removal of existing dividers, grinding/removing existing balcony coatings, partial depth, full depth and overhead concrete balcony repairs, installation of new balcony deck and soffit coatings and installation of new aluminum dividers. Contract scope also included some sealant replacements and miscellaneous brick repairs and/or tuckpointing. We just received a Change Order to proceed with window lintel façade repairs on the pool elevation as well.

AVA Ballston

AVA Ballston

Overview

_________

Location: Arlington, VA 

Owner: Avalon Bay Properties

Engineer: Smislova, Kehnemui & Associates

Project Duration: 11 months

The AVA Ballston Apartment building is a 10-story high-rise, post tensioned building with approximately 344 units constructed in 1989. Visible signs of structural distress in the forms of spalling and delamination had occurred on the balcony slabs due to their embedded railings. Water infiltration was present along the building façade due to lack of proper flashing details. Additionally, damaged mortar joints and façade masonry in conjunction with deteriorated sealants were aiding water infiltration affecting the long-term integrity of the building.

 

Work-scope repairs included installation of new surface mounted railings, repairing all damaged concrete and post-tension components, removal and replacement of all sealants, and installation of pedestrian traffic coatings on all balcony slabs to ensure concrete repair longevity. Along the entire façade through wall flashings were installed, damaged facade masonry and joints were repaired, and all sealants and vertical expansion joints were replaced.

TechWorld

TechWorld

Overview

_________

Location: Washington DC

Project Size: $7,194,157.60

Owner: TechWorld Owner’s Association

Engineer: Construction Insight DC LLC

Project Duration: 2 years

The TechWorld campus is located in downtown Washington DC right next to Chinatown and two blocks from the Capital One Arena. 4 different addresses span the city block that sits overtop of the 500,000 square foot garage. Repairs at this jobsite required coordination with the Renaissance Hotel, the DEA, several restaurants, a labor union, a post office, and a building undergoing a complete top to bottom renovation. Two years were spent working inside these spaces as well as the loading dock and large parking garage below. Water leaking from a large paver plaza above and heavy traffic inside the garage contributed to the deteriorating condition of the concrete surfaces on the property. In addition to water entering from above, water was also making its way into the garage from below the mat slab and through the foundation walls. Thousands of feet of horizontal and vertical grout injection were carefully performed and monitored over several months to ensure sub-terranean water was being directed elsewhere. While the source of the water infiltration was being addressed, hydro demolition was performed on the concrete surfaces to repair the large scale of delaminations. Once structural repairs were complete, expansion joints and waterproofing were installed to ensure the new slabs were protected from future movement and moisture.

Notable project work scope items included:

 ·         75,750 square feet of partial depth hydro demolition and install of new concrete slab

·         10,000 square feet of mat slab repair

·         500,000 square feet of corrosion inhibitor treatment and urethane traffic membrane install

·         Over 5,000 linear feet of grout injection at wall and deck cracks

·         Over 20,000 linear feet of new rebar

·         5,365 linear feet of expansion joint removal and replacement

·         600,000 sf of new paint on soffit, walls, and columns

·         New Elevator Lobby slip joints

·         390 linear feet of heavy-duty expansion joint and steel cover plate replacement at the properties loading dock

·         New trench drains and concrete islands at garage entrances

The Continuum on South Beach

The Continuum on South Beach

Overview

_________

Location: Miami, FL 

Owner: The Continuum on South Beach Master Association, Inc.

Engineer: Willcott Engineering, Inc.

Project Duration: 2 Years

The Continuum front entrance and plaza deck sits on an elevated slab above the parking garage. The parking garage was experiencing water intrusion through multiple locations due to the failed waterproofing system located at the structural slab. The repair protocol called for complete demolition of the existing overburden down to the structural slab, removal of existing waterproofing, installation of new waterproofing system, and then complete build back of plaza deck. The main reason for this project was to stop any leaks that occurred in the parking garage and to protect the structure for many years to come. 

National Capital Bank

National Capital Bank

Overview

_________

Location: Washington, DC 

Owner: The National Capital Bank of Washington

Engineer: Tadjer Cohen Edelson Associates

Project Duration:

National Capital Bank is a full-service community bank headquartered on Capitol Hill in Washington DC. Founded and built in 1889, it is Washington DC’s oldest bank. Offering walk in and drive through service, NCB is well positioned to assist its surrounding community.

 

This project addressed various structural and waterproofing repairs across the property. Exterior brick and lintels showed wearing from exposure to the elements. The existing surface lot consisting of a PT slab with asphalt overlay showed visual signs of deterioration from years of heavy traffic. As a result, active leaking was experienced inside the bank’s operating office space. Inside, the subgrade garage exhibited drastic spalling of the concrete structure spanning from the deck, to columns, beams, etc. To address these issues, the scope of the project consisted of the following:

  • 25,000 sf of wall-to-wall partial depth hydro demolition and install of new concrete slab
  • 6,000 sf of full depth concrete repair
  • 8,000 sf of asphalt removal
  • 1,000 sf of topping slab R&R and hot apply install
  • 800 sf of new bonded overlay at teller window drive through
  • Post-Tension cable repairs
  • 300 lf of brick R&R to facilitate new flashing
  • New ADA ramp installation inside garage
  • 200 lf of new Aluminum Cap over Coping Stones
  • 500 lf of Mortar Joint Tuckpointing
  • Exterior Foundation Wall Waterproofing
  • 1,400 sf of penetrating brick sealer
  • 125 lf of expansion joint replacement
  • 100 lf of hydrophilic foam injection
  • 16,000 sf of SOG corrosion inhibitor treatment
  • 33,200 sf of new urethane traffic bearing membrane in the garage and on the surface lot

3 Bethesda Metro Center

3 Bethesda Metro Center

Overview

_________

Location: Washington, D.C. 

Project Size: $7,053,075 

Owner: Brookfield Properties

Engineer: Smislova, Kehnemui & Associates (SK&A)

Project Duration: 2.5 years

3 Bethesda Metro Center is a 368,000 square foot office building located in the heart of Bethesda, Maryland. The 16-story building has balconies on the upper floors, a large brick plaza, and many great amenities including a fitness center and lounge. Located on the 7th Street retail corridor, 3 Bethesda Metro Center is within walking distance of restaurants, retail stores, museums, and more. Perhaps most notable is its proximity to the Bethesda metro station on the Red Line, which services over 9,000 passengers daily.


This project addressed repairs in the building’s expansive garage, Metro bus terminal, various stairwells, air shafts, and ramps. The garage exhibited visual spalling to the extent that prompted wall-to wall hydro on the entire 1
st two levels of the garage. Once complete, all concrete surface in the garage were coated with a vehicular, urethane coating membrane. Concrete and waterproofing repairs on the Metro Bus loop were coordinated with WMATA to ensure the regularly scheduled bus routes were unaffected as work progressed over a 6-month period. All loading docks and ramps had complete removal and replacement of their concrete topping slabs and hot applied waterproofing.

This two and half year long project consisted of 164 different work items including the following notable repairs:

  • 121,000 square feet of wall-to-wall partial depth hydro demolition and install of new concrete slab
  • 39,000 square feet of full depth hydro demo
  • 22,000 square feet of hydro demo patch repair
  • 9,000 square feet of waffle slab repair
  • 356,000 square feet of urethane traffic coating system
  • 178,000 square feet of corrosion inhibitor application
  • 60 new drain install locations and 2,400 linear feet of new piping
  • 1,000 linear feet of new pipe rail fencing
  • 2,500 linear feet of expansion joint removal and re-installation
  • 12,000 square feet hot applied waterproofing
  • Over 500,000 square feet of new soffit, wall, and column paint with color banding

Poff Federal Building

Poff Federal Building

Overview

Poff Federal Building Garage Rehabilitation

_________

Location: Roanoke, VA 

Owner: U.S. General Services Administration

General Contractor: Hoar Construction

Engineer: McMullan & Associates, Inc.

Project Duration: 14 months

Project Value: $2,114,682

The Poff Federal Building in Roanoke, Virginia, a 14-story high-rise, serves as a key government facility housing 400 to 500 federal employees, including offices for the General Services Administration (GSA) and the Circuit Court. Over 40 years of weathering had significantly deteriorated the adjacent parking garage, raising concerns about its structural integrity and long-term durability.

 

To address these issues, Concrete Protection & Restoration, Inc. (CPR) executed a comprehensive structural restoration, ensuring long-term stability, improved safety, and enhanced durability for the facility.

 

Scope of Work

 

The project required extensive structural rehabilitation, focusing on deteriorated concrete repair and reinforcement. Major restoration elements included:

Hydro-Demolition

  • Performed by Prepcon
  • Removed 32,000 square feet of deteriorated concrete via hydro-demolition.

Concrete Overlay

  • Installed a new concrete overlay to strengthen the structure and improve durability

Full-Depth Concrete Repairs

  • Performed 5,000 square feet of full-depth repairs to restore heavily damaged sections.

Structural Beam & Column Replacement

  • Replaced compromised beams and columns to reinforce the structural framework.

Vertical & Overhead Corrosion Protection

  • Applied a corrosion inhibitor treatment to prevent further steel reinforcement degradation.

New Stair Installation

  • Constructed new concrete stairs to enhance safety and accessibility.

Expansion Joint Replacement & Crack Repair

  • Replaced failed expansion joints to improve structural movement and prevent water intrusion.
  • Utilized chemical grout injection for crack repairs, ensuring long-term durability.

Traffic-Bearing Membrane Installation

  • Applied a protective membrane on the top deck to safeguard against moisture infiltration and extend surface life.

 

Project Impact & Results

 

The restoration of the Poff Federal Building parking structure significantly improved the structural integrity, longevity, and safety of the facility. By integrating advanced hydro-demolition techniques, high-performance concrete overlays, and protective treatments, CPR successfully extended the service life of the garage while minimizing future maintenance costs.

 

This project reinforces CPR’s commitment to preserving critical infrastructure, delivering solutions that enhance durability and protect structural investments for decades to come.

 

*Concrete Protection & Restoration, Inc. provides expert concrete restoration services throughout Florida, Maryland, Virginia, Pennsylvania, Washington D.C., and beyond.

Tyson’s Corner Marriott

Tyson’s Corner Marriott

Overview

_________

Location: Vienna, VA  

Owner: MTC Hotel TRS LLC

Engineer: Construction Insights Inc.

Project Duration: 

The Tyson’s Corner Marriott property consists of a 15-story high hotel situated on five acres off Leesburg Pike in Virginia. Built in 1979, this hotel has 396 rooms, almost 10,000 square feet of meeting & event space, and a recreational pool. There a two-level parking garage which offers on-site parking. The first level of the garage is open air with a portion directly under the hotel’s meeting space. A ramp takes you down to the enclosed, on grade second level. The base contract consisted of the following repair items:

  • 5000 SF of Partial and Full Depth Hydro Demolition Patch Repairs
  • Full Depth Laundry Room Repairs
  • Overhead, Vertical, SOG concrete repairs
  • Expansion Joint Installation
  • 20,000 SF of coating removal and full system install
  • 30,000 SF of Re-coat

 

As the project progressed additional repairs were added to the scope due to the deteriorating conditions around the property:

  • Full Depth Kitchen Closet Repairs and new Epoxy Flooring
  • 2,000 SF of topping slab removal and replacement at hotel sidewalk
  • 2,000 SF of hot apply installation at sidewalk with WP turndown at foundation wall
  • Partial and Full depth repairs at Loading Dock
  • New Traffic Membrane at Loading Dock
  • Remove existing parging in Vent Shaft and apply new elastomeric coating on CMU walls

 

Waterside Towers Plaza

Waterside Towers Plaza

Overview

Parking Structure and Plaza Deck Restoration Project

_________

Location: Washington, DC

Owner: UDR

Engineer: B Squared Engineering, LLC

Project Duration: 30 months

Waterside Towers is located in the Southwest Quadrant of Washington DC. The complex is comprised of three residential apartment towers, eighteen townhome apartments, a motor court and a centrally located parking garage structure. A pedestrian plaza is located above the garage. The plaza deck is accessed from two of the towers as well as from the motor court which is located one level below the plaza.  The townhome entrances are accessed from the plaza deck.

 

The scope of this project involved the structural rehabilitation of the pedestrian plaza above the garage, the motor court level of the garage and the basement level of the garage. The removal of the overburden and replacement of the waterproofing system of the plaza area was also included. All expansion joint glands were replaced at the plaza and suspended garage slab levels. During the course of the project, the work area and scope of work was expanded, to include the garage area under the motor court and the garage area under the townhouses.

 

The objective of the project was to complete the structural repairs, which would create some inconvenience to the residents, in the least disturbing manner. At the completion of the structural repairs and waterproofing work, a new outdoor space for the residents’ use would be created at the plaza level.

 

Awards: ICRI Baltimore-Washington Chapter 2018 Project of the Year – 1st Place

Montgomery County Executive Office Building Plaza Replacement

Montgomery County Executive Office Building Plaza Replacement

Overview

Executive Office Building and Montgomery County Circuit Court Plaza Renovation

_________

Location: Rockville, MD 

Owner: Montgomery County Maryland

Engineer: Smislova, Kehnemui & Associates, P.A.

Project Duration: 18 months

 

The Executive Office Building and Montgomery County Circuit Court was constructed in 1974.  The plaza is located between both the Montgomery County Executive Office Building and the Montgomery County Circuit Court Building. In addition, residential condominiums are located directly across the street.  Hence, the local noise ordinance restricted night time work.

 

Deteriorating finishes and an aging (40+ years), failing waterproofing system that had resulted in numerous leaks to the spaces below required repairs. 

 

The scope required the following: 

  • Complete removal of the existing overburden to the structural slab
  • Removal of the existing waterproofing
  • Identifying and repairing the structural slab
  • Installation of a corrosion inhibitor on the entire structural slab
  • installation of 215 mils of hot applied waterproofing
  • Installation of new expansion joints
  • Laying out and installing new finishes including an asphalt drive, granite clad planters, installing the associated landscaping, concrete walks that provided a dedicated ADA pathway, relocation of existing storm drains and the installation of new storm structures (15 and 18 inch storm lines), and all necessary signage.  
  • Since, the public accessed the 23,500 square foot plaza daily, temporary, dedicated walkways were constructed and installed during the project duration. 

 

Awards: ICRI Baltimore-Washington Chapter 2017 Project of the Year – 1st Place 

The Jefferson

The Jefferson - Phase II

Overview

The Jefferson Façade Restoration (Phase II Balcony and Facade Repairs)

_________

Location: Arlington, VA 

Owner: Sunrise Senior Living Inc.

Engineer: Armko Industries Inc.

Project Duration: 2 years

Phase II of the Jefferson Façade Restoration consisted of restoring 118 balconies, 6 bay window region soffits, 9 PVC soffits, and the entire building façade. The balconies and building had encountered leaking because of the limited performance of barrier waterproofing systems. CPR was responsible for restoring the regions where we were working with water management waterproofing systems to prevent the same issues from occurring in the long term.

GBMC – Daffodil Garage

GBMC - Daffodil Garage

Overview

Priority Structural Repairs & Waterproofing

_________

Location: Towson, MD

Owner: Greater Baltimore Medical Center 

Project Duration: 8 months

The Daffodil Garage is a 3.5 level parking structure located on the Greater Baltimore Medical Center campus in Towson, MD.  The original garage was built in 1976 as a post-tensioned reinforced concrete flat-plate structure.  One unusual feature of this garage was that the entrance and exit were on the top level and access to the lower levels was made possible by up/down ramps located on the east and west ends of the structure.  A second phase of construction took place in 1993, which involved the addition of a helical access ramp on the west end of the garage and the installation of post-tension “infill slabs” at the locations of the original ramps.  After years of neglect and due to some odd design features and questionable decisions on the part of the facilities management at the time, the garage was in poor condition and in serious need of repair to in order to assure the continued life/safety of all garage occupants. 

 

Awards: 

ICRI Baltimore-Washington Chapter 2016 Project of the Year – 2nd Place

PTI – Award of Merit (2017) 

MacArthur Boulevard

MacArthur Boulevard

Overview

MacArthur Boulevard Garage and Structural Steel Repairs

_________

Location: Bethesda, MD

Engineer: Tate, Shahbaz & Associates P.C.

Project Duration: 4 months

6106 MacArthur Blvd is a 2-story office building with a half-level below used for parking.  Located in Bethesda, MD less than a mile from the DC line, the building sits on a steep hill with the east corner of the building on-grade and the parking garage on west side of the structure being cast-in-place concrete slab supported by structural steel framing on the hill.  After years of rain/weather exposure combined with poor drainage and lack of a protective coating on the steel members, the steel beams along the west side of the building showed signs of corrosion and there was evidence of settlement within the brick façade.  A structural engineer was contacted to perform an inspection of the structure, and it was determined that work needed to be done to reinforce the steel beams and protect them from further damage.  A repair scope was developed which included:

 

  1. Demo and remove brick parapet walls and column jackets supported by the slab edge
  2. Demo existing concrete slab edge to expose top side of structural steel beams
  3. Sandblast to remove all corrosion rust on steel beams and columns
  4. Install/weld supplemental steel plates and angles to reinforce steel framing
  5. Paint all structural steel with protective epoxy coating
  6. Re-build concrete slab edge and brick parapet walls/columns
  7. Perform partial and full depth concrete repairs to elevated garage slab
  8. Apply Corrosion Inhibitor Treatment to elevated slab
  9. Install polyurethane vehicular waterproof membrane & repaint parking lines

Dolphin Tower Restoration

Dolphin Tower Restoration

Overview

_________

Location: Sarasota, Florida
Project Size: $9,000,000
Owner: Dolphin Towers Condominium Association, Inc.
Engineer: Karins Engineering Group
Specialty Engineer: Morabito Consultants

Project Overview

 

The Dolphin Tower in Sarasota, Florida, faced a critical structural failure that led to the immediate evacuation of all 117 residential units in June 2010. Large cracks in the fourth-floor transfer slab—a key structural element that supports the upper floors—posed a serious risk to the entire building’s stability. Without immediate action, the building was in danger of further deterioration and potential collapse.

In April 2014, Concrete Protection & Restoration(CPR) was awarded the contract to restore the building’s safety and stability. The project required a complete overhaul of the damaged slab, reinforcement of critical structural components, and upgrades to bring the building up to modern safety standards. Through expert planning and execution, CPR successfully restored Dolphin Tower on schedule and under budget, ensuring it was safe for residents to return.

 

The Challenge: A Structural Emergency

 

The transfer slab failure at Dolphin Tower created a dangerous situation that required immediate attention. The key challenges included:

  • Emergency Shoring & Stabilization: Temporary structural support was necessary to prevent further damage.
  • Structural Weakness: The cracked slab compromised the integrity of the entire 15-story building.
  • Code Compliance: Repairs needed to meet updated building codes and withstand hurricane-force winds.
  • Resident Displacement: The building’s evacuation meant repairs had to be efficient and timely.

With these challenges in mind, CPR developed a strategic restoration plan that prioritized safety, durability, and long-term performance.

 

The Solution: Advanced Repair Techniques 

 

Restoring Dolphin Tower required more than just fixing cracks, it demanded a complete structural overhaul to ensure the building’s future stability.

 

Key Repairs & Reinforcements:

 

  • Foundation Strengthening: Reinforcing the building’s foundation to support the restored structure.
  • Transfer Slab Repair & Reinforcement: Shoring the damaged slab, reinforcing it with high-strength materials, and redistributing loads to prevent future failures.
  • Column Enlargements & Shear Wall Installation: Strengthening load-bearing columns and adding reinforced concrete shear walls to improve the building’s stability against lateral forces like wind.
  • Exterior Wall Replacement: Removing and replacing weakened CMU walls with poured-in-place reinforced concrete for superior durability.
  • Carbon Fiber Reinforcement & Post-Tensioning: Using carbon fiber strengthening and post-tensioned concrete techniques to reinforce structural components while minimizing weight and space requirements.
  • Upper-Level Structural Upgrades: Identifying and reinforcing additional stress points to bring the building up to modern wind load requirements.

By integrating cutting-edge repair techniques, CPR ensured that Dolphin Tower was not just repaired, but rebuilt for long-term safety and performance.

 

Why This Project Matters

 

This restoration highlights the importance of proactive maintenance and expert repairs in aging concrete buildings. Dolphin Tower’s failure was not sudden—it was a result of years of stress and wear. This project emphasizes:

  • The necessity of early detection and structural monitoring to prevent costly failures.
  • The value of using modern repair techniques, such as carbon fiber reinforcement and shear wall installation, to extend a building’s lifespan.
  • The importance of working with experienced concrete restoration specialists who understand both emergency repairs and long-term solutions.

Concrete structures, especially high-rise buildings, require ongoing care, regular inspections, and quality repairs to remain safe and functional.

 

Keeping Buildings Safe for the Future

 

At Concrete Protection & Restoration, we specialize in concrete repair, structural rehabilitation, and advanced restoration solutions for high-rise buildings, parking structures, and critical infrastructure. We take a proactive, long-term approach to concrete restoration, ensuring safety, durability, and compliance with modern building standards.

If your structure requires concrete repair, structural strengthening, waterproofing, or corrosion protection, CPR has the expertise to extend its service life and prevent costly failures.

Westminster Clock Tower

Westminster Clock Tower

Overview

66 East Main Street 

_________

Location: Westminster, MD

Restoring Westminster’s Historic Clocktower: A Landmark Revitalized

The historic clocktower in Westminster, Maryland, has long stood as a cherished landmark, sitting atop a retired three-story fire engine house. For nearly 130 years, it has connected the city’s residents to their history and served as a part of daily life, marking the hours with its iconic chimes. But decades of water damage and neglect left the clocktower in a state of severe structural distress, forcing the City of Westminster to decide whether to restore the beloved landmark or demolish it for safety reasons.

 

Thanks to collaboration between city officials, a dedicated local engineer, a specialized restoration contractor, and significant funding from state and federal sources, the clocktower was brought back to life in a complex, large-scale rehabilitation project completed in 2023. Here’s how this monumental project unfolded.

 

Identifying the Challenges: Structural Distress and Water Damage

The clocktower’s structural issues were both extensive and urgent. Built in 1896, the 35-foot-tall tower—sitting 60 feet above the ground—featured triple-wythe brick masonry and timber framing with intricate architectural details. Decades of water intrusion, freeze-thaw cycles, and a lack of routine maintenance had caused severe masonry deterioration. Key issues included:

  • Bulging and deteriorated masonry under the metal cornice.
  • Subsiding arches, leaving visible gaps.
  • Cracked and missing mortar throughout the tower’s base.
  • Rust and corrosion on architectural elements, exacerbated by water damage.
  • Vandalism, including broken windows and damaged ornamental pieces.

Initial inspections revealed that the root cause was failed seams around the metal cornice, which allowed water to seep into the masonry. The damage was worsened by the structure’s age and inadequate upkeep.

 

Planning the Restoration: A Collaborative Effort

The City of Westminster’s decision to restore the clocktower required careful planning. A local engineering firm was engaged to evaluate the structure and design a comprehensive rehabilitation plan. In 2022, the project was publicly bid, and a contractor with expertise in historic restoration was selected. The restoration team faced significant challenges, including:

  • Structural Stabilization: Temporary shoring was installed to support the upper two-thirds of the tower, which weighs approximately 75,000 pounds, while the deteriorated base was reconstructed.
  • Material Selection: Durable, low-maintenance materials were prioritized to minimize future upkeep without altering the historic aesthetic.
  • Tight Site Constraints: The project required innovative solutions, such as strengthening scaffolding to serve as a storage area, due to limited ground-level space.

 

The Rehabilitation Process: Preserving History with Modern Solutions

 
1. Demolition and Stabilization

The project began with the careful dismantling of the clocktower’s base. The salvaged bricks were cleaned and reused as a veneer over a new, reinforced concrete masonry unit (CMU) structure. Simultaneously, a state-of-the-art shoring system supported the upper sections of the tower during reconstruction.

 
2. Structural and Architectural Repairs
  • Masonry Reconstruction: The base was completely rebuilt using durable materials, while maintaining its historic appearance.
  • Roof Repairs: Localized slate roof repairs addressed leaks, and new flashing was installed to prevent future water intrusion.
  • Clock Mechanism Restoration: The clock components were dismantled, cleaned, and serviced to restore functionality.
 
3. Modernizing for Durability

To enhance the structure’s longevity, the team incorporated materials like composite flooring, PVC soffits, and fiberglass replicas of architectural components. A 16-ounce copper cornice replaced the original steel cornice, which had corroded over time.

 
4. Aesthetic Preservation

Great care was taken to ensure the restored tower matched its original appearance. The historic bricks were reinstalled, and new architectural elements were fabricated to replicate the originals. Uplighting and backlighting systems were added to enhance the clocktower’s visibility and allow for seasonal displays.

 

Results: A Revitalized Landmark for Generations to Come

The clocktower restoration not only stabilized the structure but also revitalized its role in the community. Its chimes, now restored, once again mark the hours for Westminster residents. New lighting highlights the tower’s beauty at night, while modern materials ensure minimal maintenance for city personnel.

 

By combining historic preservation techniques with modern engineering solutions, the project team succeeded in saving an irreplaceable piece of Westminster’s history. Today, the clocktower stands as a testament to the city’s commitment to preserving its heritage while embracing the future.

 

Whether viewed from bustling Main Street or admired during holiday celebrations, the Westminster clocktower continues to inspire and unite the community it has served for over a century.